Look for Lane Restrictions on the Bellevue Bridge for Pavement Repair Work

Pavement work to Begin on May 12th and Last Through June 20th.

  • 12 May 2025
  • Author: Phil Davidson
  • Number of views: 2206
  • 0 Comments
Look for Lane Restrictions on the Bellevue Bridge for Pavement Repair Work

The Bellevue Bridge Commission has announced that pavement repair work will begin on May 12 and last through June 20th on Bellevue Bridge on either side of the toll booth.  The work will start on the eastbound lanes and then switch to the westbound lanes.  The bridge will remain open during construction with traffic control devices in place.  No tolls will be collected during this time due to the inconvenience this work will cause. 

Print
Categories: Announcements
Tags:
Rate this article:
5.0

x
«December 2025»
MonTueWedThuFriSatSun
24252627282930
1234567
891011121314
15161718192021
22232425262728
2930311234

Archive